L.V Cabling & Compressor
Installation for Britvic Soft Drinks
Estil
were contracted by Britvic Soft Drinks to carry out the L.V distribution
to all of the equipment associated with a new bottling line.
This involved installing supplies to the following items of equipment:
New Belliss & Morcom 550kW H.P Compressor
New Sidel Bottle Blowing Machine
New Conveyor Line Control System
New Chiller
The majority of the cabling was installed at high level on heavy duty
ladder racking.
The compressor installation was carried out in conjunction with Belliss
& Morcom with Estil also designing, manufacturing and supplying the
550kW inverter controlled control system for the machine and its
associated cooling system.
The work was completed without disruption to the existing production
with work being carried out over weekend periods where necessary.